M.Arch candidate,
Columbia GSAPP, 2027
New York, NY
Attempts at understanding
social infrastructures
in crisis and transformation.
Different story for a different time.
M.Arch candidate,
Columbia GSAPP, 2027
New York, NY
The Rossville LNG tanks are a contemporary industrial ruin: fully constructed yet never operational, maintained yet unused. Built in the 1970s for a proposed liquefied natural gas import facility, they were suspended by public opposition, regulatory intervention, and decades of unrealized redevelopment proposals. The project reinterprets them through the framework of a waqf (وقف), preserving their monumental void while giving them a new civic and spiritual function: a center for the study and performance of sacred vocal practice, particularly Qur’anic recitation and the adhan.
A waqf is an endowment: property set aside permanently for a public or religious purpose, and sustained by the income of what is attached to it. Here the tanks are held in trust rather than redeveloped, and the small commercial strip along the approach supports the center.
Columbia GSAPP
Advanced Studio IV
Spring 2026
Rossville, Staten Island, New York
Right: One of the tanks rising above the neighboring houses.
Below: Site, Rossville, Staten Island. The two tanks, the shoreline, and the expressway.


Below: The tanks in the record. The 1973 Federal Register notice of Distrigas of New York’s application for the Rossville terminal, then about 90 percent complete; Senator John J. Marchi’s 1975 bills to bar LNG ships from the Port of New York; and the 2023 New York State bill extending the moratorium on LNG facilities in the city to 2025.



Below: Site elevation. The two tanks, the approach, and the commercial activity supporting the mission.

A spatial curriculum links the nearby Islamic Center of Staten Island to the tanks through a processional sequence of learning, training, and collective recitation. Openings, circulation, and program gather around the points of intervention, so the organization of the project grows directly out of the structural logic of the tanks. Insertions occupy only local portions of the structures, keeping the shell continuous and the immense acoustic void intact.
Right: Sequence of the intervention. Precast concrete panels are removed selectively, and steel transfer frames inserted at each opening carry hoop and vertical loads around it. Demolition is kept to a minimum and the precast enclosure stays continuous.







Above: Plan of the insertion against the tank shell.
Below: Sections through the tanks. Insertions hold to the edges of the shell; the central void stays open as an acoustic chamber.



Below: The tank reopened as a center for sacred vocal practice. A procession makes its way to the entrance.